When.com Web Search

  1. Ad

    related to: how to calculate kva power requirements

Search results

  1. Results From The WOW.Com Content Network
  2. Power factor - Wikipedia

    en.wikipedia.org/wiki/Power_factor

    At low values of power factor, more apparent power needs to be transferred to get the same real power. To get 1 kW of real power at 0.2 power factor, 5 kVA of apparent power needs to be transferred (1 kW ÷ 0.2 = 5 kVA). This apparent power must be produced and transmitted to the load and is subject to losses in the production and transmission ...

  3. Mathematics of three-phase electric power - Wikipedia

    en.wikipedia.org/wiki/Mathematics_of_three-phase...

    The plotted line represents the variation of instantaneous voltage (or current) with respect to time. This cycle repeats with a frequency that depends on the power system. In electrical engineering, three-phase electric power systems have at least three conductors carrying alternating voltages that are offset in time by one-third of the period ...

  4. Volt-ampere - Wikipedia

    en.wikipedia.org/wiki/Volt-ampere

    A common prefixed derived unit is "kilovolt-ampere" (symbol kVA). The VA rating is limited by the maximum permissible current, and the watt rating by the power-handling capacity of the device. When a UPS powers equipment which presents a reactive load with a low power factor, neither limit may safely be exceeded. [4]

  5. Three-phase electric power - Wikipedia

    en.wikipedia.org/wiki/Three-phase_electric_power

    Three-phase electric power (abbreviated 3ϕ [1]) is a common type of alternating current (AC) used in electricity generation, transmission, and distribution. [2] It is a type of polyphase system employing three wires (or four including an optional neutral return wire) and is the most common method used by electrical grids worldwide to transfer ...

  6. Electric power distribution - Wikipedia

    en.wikipedia.org/wiki/Electric_power_distribution

    Closer to the customer, a distribution transformer steps the primary distribution power down to a low-voltage secondary circuit, usually 120/240 V in the US for residential customers. The power comes to the customer via a service drop and an electricity meter. The final circuit in an urban system may be less than 15 metres (50 ft) but may be ...

  7. Per-unit system - Wikipedia

    en.wikipedia.org/wiki/Per-unit_system

    In the power systems analysis field of electrical engineering, a per-unit system is the expression of system quantities as fractions of a defined base unit quantity. . Calculations are simplified because quantities expressed as per-unit do not change when they are referred from one side of a transformer to t

  8. Capacity factor - Wikipedia

    en.wikipedia.org/wiki/Capacity_factor

    At the low range of capacity factors is the photovoltaic power station, which supplies power to the electricity grid from a large-scale photovoltaic system (PV system). An inherent limit to its capacity factor comes from its requirement of daylight , preferably with a sun unobstructed by clouds, smoke or smog , shade from trees and building ...

  9. Load bank - Wikipedia

    en.wikipedia.org/wiki/Load_bank

    A resistive/reactive inductive and/or capacitive load is often required to test solar inverters to ensure solar panels can be stopped from producing electricity in the event of a power outage. The resistive/reactive combination load banks are used to test the engine generator set at its rated power factor. In most cases this is 0.8 power factor ...