NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) ... Raipur: 8 Hydro HQ Delhi:
Lara Super Thermal Power Station is a coal-fired power project located near village Lara, Taluk Pussore, Raigarh district in Indian state of Chhattisgarh.The power plant is one of the coal based power plants of NTPC. [1]
You are free: to share – to copy, distribute and transmit the work; to remix – to adapt the work; Under the following conditions: attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made.
Technovate is a non-profit fest organised by the students of IIIT Naya Raipur. It began as a techno-cultural fest in 2016, and draws thousands of visitors from colleges all over India. The three-day fest held every year in month of February or March. The fest includes technical events, cultural events, informal events and celebrity night.
The Vindhyachal Thermal Power Station is located in Singrauli district in the Indian state of Madhya Pradesh.One of the coal-fired power stations of NTPC, it is the largest power station in India, and the 10th largest coal-fired power station in the world, with an installed capacity of 4,760 MW with total of 4783 MW. [1]
The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
Kudgi Super Thermal Power Project will have an installed capacity of 4000 MW (3x800 MW in first stage and 2x800 MW in second stage). Doosan Power systems India Pvt Ltd will supply Steam Generator for the plant & Toshiba JSW Power Systems Pvt Ltd will supply super-critical steam turbine and generator and L&T Howden will supply Axial fans to NTPC for the plant. [2]
The project was originally proposed in 1999 but got delayed because Coal India Limited objected to the location of the power plant and wanted NTPC to relocate the power plant as it was coming up on site having 6 billion tonnes of coal underneath it. Coal India Limited withdrew the coal linkage to the plant in 2008.