Search results
Results From The WOW.Com Content Network
The installation of overhead lines may require reconstruction of bridges to provide safe electrical clearance. [20] Overhead lines, like most electrified systems, require a greater capital expenditure when building the system than an equivalent non-electric system. While a unelectrified railway line requires only the grade, ballast, ties and ...
Train power. Overhead lines or overhead wires are used to transmit electrical energy to trams, trolleybuses or trains. Overhead line is designed on the principle of one or more overhead wires situated over rail tracks. Feeder stations at regular intervals along the overhead line supply power from the high-voltage grid.
The overhead line (3) and feeder (5) are on opposite phases so the voltage between them is 50 kV, while the voltage between the overhead line (3) and the running rails (4) remains at 25 kV. Periodic autotransformers (9) divert the return current from the neutral rail, step it up, and send it along the feeder line.
The silk on a spider's web forming multiple elastic catenaries. In physics and geometry, a catenary (US: / ˈkætənɛri / KAT-ən-err-ee, UK: / kəˈtiːnəri / kə-TEE-nər-ee) is the curve that an idealized hanging chain or cable assumes under its own weight when supported only at its ends in a uniform gravitational field.
The combined transmission and distribution network is part of electricity delivery, known as the electrical grid. Efficient long-distance transmission of electric power requires high voltages. This reduces the losses produced by strong currents. Transmission lines use either alternating current (AC) or direct current (DC).
The overhead wiring, generally having two separate overhead lines and the rail for the third phase, was more complicated, and the low frequency used required a separate generation or conversion and distribution system. Train speed was restricted to one to four speeds, with two or four speeds obtained by pole-changing or cascade operation or both.
A third-rail system was used for most of the line except overhead trolley wire was installed between Mickle Street in Camden and Gloucester City as well as a 10-mile (16 km) segment between Newfield and Millville. The Camden-Gloucester City portion was installed due to a decision to use the old Camden Seventh Street line as part of the route.
Aluminium-conductor steel-reinforced cable. Sample cross-section of high tension power (pylon) line, showing 1 strand (7 wires) of steel surrounded by 4 concentric layers of aluminium. Aluminium conductor steel-reinforced cable (ACSR) is a type of high-capacity, high-strength stranded conductor typically used in overhead power lines.