When.com Web Search

  1. Ads

    related to: 513 5512866 4 post lift concrete requirements

Search results

  1. Results From The WOW.Com Content Network
  2. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    As the orientation of the void determines the lift position of the lifting clutch, the wire chair can be secured against the element reinforcement to maintain this orientation during the concrete pour and set. When an anchors load resistance must consider load reduction factors, this would imply that the particular selected anchor will form a ...

  3. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  4. American Concrete Institute - Wikipedia

    en.wikipedia.org/wiki/American_Concrete_Institute

    ACI 318 Building Code Requirements for Structural Concrete provides minimum requirements necessary to provide public health and safety for the design and construction of structural concrete buildings. [6] It is issued and maintained by the American Concrete Institute. [7] The latest edition of the code is ACI 318-19.

  5. Caisson (engineering) - Wikipedia

    en.wikipedia.org/wiki/Caisson_(engineering)

    Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.

  6. Prestressed concrete - Wikipedia

    en.wikipedia.org/wiki/Prestressed_concrete

    Post-tensioned concrete is a variant of prestressed concrete where the tendons are tensioned after the surrounding concrete structure has been cast. [ 1 ] : 25 The tendons are not placed in direct contact with the concrete, but are encapsulated within a protective sleeve or duct which is either cast into the concrete structure or placed ...

  7. Glossary of prestressed concrete terms - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_prestressed...

    A method of prestressing concrete where the tendons are tensioned before the concrete is placed. [1]: 51 post-tensioning post-tensioned A method of prestressing concrete where the tendons are tensioned after the concrete has attained a specified minimum strength or age. [1]: 50 prestress level

  8. Tilt up - Wikipedia

    en.wikipedia.org/wiki/Tilt_up

    A finished tilt-up building. Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete.Though it is a cost-effective technique with a shorter completion time, [1] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.

  9. Properties of concrete - Wikipedia

    en.wikipedia.org/wiki/Properties_of_concrete

    Reactive powder concrete, also known as ultra-high-performance concrete, can be even stronger, with strengths of up to 800 MPa (116,000 PSI). [4] These are made by eliminating large aggregate completely, carefully controlling the size of the fine aggregates to ensure the best possible packing, and incorporating steel fibers (sometimes produced ...