When.com Web Search

  1. Ads

    related to: premier equestrian footing forms for concrete driveway blocks home depot

Search results

  1. Results From The WOW.Com Content Network
  2. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...

  3. North American Single-footing Horse - Wikipedia

    en.wikipedia.org/wiki/North_American_Single...

    The North American Single-footing Horse, also called the Single-footing Horse or Single-footer, is a horse breed originating in the southern United States.The term "single-foot" refers to an intermediate ambling gait, sometimes alternately called the rack or paso largo, where the horse lifts each foot up separately and puts it down alone.

  4. Form liner - Wikipedia

    en.wikipedia.org/wiki/Form_liner

    When the masterwork is finished, a cast is made using synthetic liquid rubber, and from this cast, form liners are produced in the reverse image of the original. A form liner panel is placed on the inside of a concrete forming system before the concrete has been poured and acts as a mold for the concrete to be formed against. Once the concrete ...

  5. Retaining wall - Wikipedia

    en.wikipedia.org/wiki/Retaining_wall

    Dry-stacked gravity walls are somewhat flexible and do not require a rigid footing. They can be built to a low height without additional materials being inserted, and have concrete added for strength and stability. [8] Earlier in the 20th century, taller retaining walls were often gravity walls made from large masses of concrete or stone.

  6. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...

  7. Strap footing - Wikipedia

    en.wikipedia.org/wiki/Strap_footing

    A strap footing is a component of a building's foundation. It is a type of combined footing, [1] consisting of two or more column footings connected by a concrete beam. This type of beam is called a strap beam. It is used to help distribute the weight of either heavily or eccentrically loaded column footings to adjacent footings. [2]