Ads
related to: critical flow calculation worksheet excel template examples word doc freecanva.com has been visited by 100K+ users in the past month
Search results
Results From The WOW.Com Content Network
Gradually varied flow occurs when the change in flow depth per change in flow distance is very small. In this case, hydrostatic relationships developed for uniform flow still apply. Examples of this include the backwater behind an in-stream structure (e.g. dam, sluice gate, weir, etc.), when there is a constriction in the channel, and when ...
The project has two critical paths: activities B and C, or A, D, and F – giving a minimum project time of 7 months with fast tracking. Activity E is sub-critical, and has a float of 1 month. The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. [1]
Critical chain project management (CCPM) is a method of planning and managing projects that emphasizes the resources (people, equipment, physical space) required to execute project tasks. [1] It was developed by Eliyahu M. Goldratt .
Failure mode effects and criticality analysis (FMECA) is an extension of failure mode and effects analysis (FMEA).. FMEA is a bottom-up, inductive analytical method which may be performed at either the functional or piece-part level.
Figure 1a shows the flow through the nozzle when it is completely subsonic (i.e. the nozzle is not choked). The flow in the chamber accelerates as it converges toward the throat, where it reaches its maximum (subsonic) speed at the throat. The flow then decelerates through the diverging section and exhausts into the ambient as a subsonic jet.
This example is a very basic hydraulic jump situation where the flow approaches at a supercritical depth, y 1, and jumps to its subcritical conjugate depth, y 2, in order to obtain the necessary energy to continue moving down the channel with the given flow rate, q. Figure 6. M-y Diagram
Critical path drag is a project management metric [1] developed by Stephen Devaux as part of the Total Project Control (TPC) approach to schedule analysis and compression [2] in the critical path method of scheduling. Critical path drag is the amount of time that an activity or constraint on the critical path is adding to the project duration.
The flow rate can be converted to a mean flow velocity V by dividing by the wetted area of the flow (which equals the cross-sectional area of the pipe if the pipe is full of fluid). Pressure has dimensions of energy per unit volume, therefore the pressure drop between two points must be proportional to the dynamic pressure q.