Search results
Results From The WOW.Com Content Network
The term "in situ" distinguishes soil still in its existing condition from soil modified (filled) during construction. The differences in the soil properties for supporting building loads, accepting underground utilities, and infiltrating water persist indefinitely.
A USBR soil scientist advances a Giddings Probe direct push soil sampler.. Geotechnical investigations are performed by geotechnical engineers or engineering geologists to obtain information on the physical properties of soil earthworks and foundations for proposed structures and for repair of distress to earthworks and structures caused by subsurface conditions; this type of investigation is ...
Geotechnical surveys involve a combination of sampling, drilling, in situ testing as well as laboratory soil testing that is conducted offshore and, with samples, onshore. They serve to ground truth the results of the geophysical investigations; they also provide a detailed account of the seabed stratigraphy and soil engineering properties. [23]
Around the same time, a rudimentary soil classification system was also developed based on a material's unit weight, which is no longer considered a good indication of soil type. [ 1 ] [ 2 ] The application of the principles of mechanics to soils was documented as early as 1773 when Charles Coulomb , a physicist and engineer, developed improved ...
Its increased accuracy, speed of deployment, more continuous soil profile and reduced cost over other soil testing methods. The ability to advance additional in situ testing tools using the CPT direct push drilling rig , including the seismic tools described above, are accelerating this process.
In geotechnical engineering, a tieback is a structural element installed in soil or rock to transfer applied tensile load into the ground. Typically in the form of a horizontal wire or rod, or a helical anchor, a tieback is commonly used along with other retaining systems (e.g. soldier piles , sheet piles, secant and tangent walls) to provide ...
This includes holes advanced to collect soil samples, water samples or rock cores, to advance in situ sampling equipment, or to install monitoring wells or piezometers. Samples collected from boreholes are often tested in a laboratory to determine their physical properties, or to assess levels of various chemical constituents or contaminants.
Electrical resistivity tomography (ERT) or electrical resistivity imaging (ERI) is a geophysical technique for imaging sub-surface structures from electrical resistivity measurements made at the surface, or by electrodes in one or more boreholes. If the electrodes are suspended in the boreholes, deeper sections can be investigated.