When.com Web Search

  1. Ads

    related to: best mallet for installing snaps on wood flooring panels ideas outdoor porch

Search results

  1. Results From The WOW.Com Content Network
  2. List of timber framing tools - Wikipedia

    en.wikipedia.org/wiki/List_of_timber_framing_tools

    Tools include dividers, axes, chisel and mallet, beam cart, pit saw, trestles, and bisaigue. The men talking may be holding a story pole and rule (or walking cane). Shear legs are hoisting a timber. Below, the sticks on the log are winding sticks used to align the ends of a timber. Tools used in traditional timber framing date back thousands of ...

  3. Wood flooring - Wikipedia

    en.wikipedia.org/wiki/Wood_flooring

    Wood flooring is a popular feature in many houses. Engineered wood flooring consists of two or more layers of wood adhered together to form a plank. Typically, engineered wood flooring uses a thin layer of a more expensive wood bonded to a core constructed from cheaper wood. The increased stability of engineered wood is achieved by running each ...

  4. Nailset - Wikipedia

    en.wikipedia.org/wiki/Nailset

    A nailset or nail punch is a hand tool used for driving the exposed head of a nail or pin below the surface of a piece of wood, such as when installing decorative moulding or face-fastening wood flooring. [1] [2] Nailset usage

  5. Gimlet (tool) - Wikipedia

    en.wikipedia.org/wiki/Gimlet_(tool)

    A gimlet is a hand tool for drilling small holes, mainly in wood, without splitting. It was defined in Joseph Gwilt's Architecture (1859) as "a piece of steel of a semi-cylindrical form, hollow on one side, having a cross handle at one end and a worm or screw at the other".

  6. Mallet - Wikipedia

    en.wikipedia.org/wiki/Mallet

    A mallet is a tool used for imparting force on another object, often made of rubber or sometimes wood, that is smaller than a maul or beetle, and usually has a relatively large head. General overview [ edit ]

  7. Deck railing - Wikipedia

    en.wikipedia.org/wiki/Deck_railing

    In between the posts, two 2x4s are attached to the posts with screws for the best connection. The lower board is placed 3.5" from the top of the finish deck to the bottom of the board. The top board is placed with the top at 35" from the deck. Then the vertical 2x2 pressure treated wood balusters are installed spaced regularly every 3.5". Then ...