When.com Web Search

  1. Ads

    related to: rainproof concrete after pouring floor plan design tool 2 4
    • 3D Floor Planner

      Impress clients with our 3D

      floor plan visualization tool.

    • Pricing

      Find out how inexpensive it can be

      to run your business on Houzz Pro

Search results

  1. Results From The WOW.Com Content Network
  2. Voided biaxial slab - Wikipedia

    en.wikipedia.org/wiki/Voided_biaxial_slab

    The overall mass of concrete can be reduced by 35–50% depending on the design, [1] as a consequence of reduced slab mass, as well as lower requirements for vertical structure and foundations. Biaxial slabs commonly span up to 20 metres at a thickness of around 500 mm. [ citation needed ] The added strength also reduces the acoustic ...

  3. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  4. Hydrophobic concrete - Wikipedia

    en.wikipedia.org/wiki/Hydrophobic_concrete

    The coating is applied between 1.25-1.5 lb per square yard and continues until the whole surface is covered. If the surface requires another coat, it must be applied within forty eight hours of the initial application of the hydrophobic mixture. Once applied, the concrete must cure in a moist environment two to three hours after the application.

  5. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    Suspended slab under construction, with the formwork still in place Suspended slab formwork and rebar in place, ready for concrete pour. A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most ...

  6. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]

  7. Basement waterproofing - Wikipedia

    en.wikipedia.org/wiki/Basement_waterproofing

    In poured concrete foundations, cracks and pipe penetrations are the most common entry points for seepage. These openings can be sealed from the interior. Epoxies , which are strong adhesives, or urethanes can be pressure injected into the openings, thus penetrating the foundation through to the exterior and cutting off the path of the seepage.

  1. Ad

    related to: rainproof concrete after pouring floor plan design tool 2 4