The issuance of a drawing from the engineering/design activity to the production activity. In other words, the event when a draft becomes a completed, official document. A stamp on the drawing saying "ISSUED" documents that RTP has occurred. RTV: room-temperature vulcanizing; return to vendor: 1. RTV sealants, a way to seal joints. 2.
Serially Managed - When DoD elects to serially manage an item it becomes "DoD serially managed". This means it is a tangible item used by DoD, which is designated by a DoD, or Service Item Manager to be uniquely tracked, controlled or managed in maintenance, repair and/or supply by means of its serial number.
The shop drawing normally shows more detail than the construction documents. It is drawn to explain the fabrication and/or installation of the items to the manufacturer’s production crew or contractor's installation crews. The style of the shop drawing is usually very different from that of the architect’s drawing.
The product data submittal usually consists of the manufacturer's product information. The information included in this submittal are: Manufacturer, trade name, model or type number and quantities: This information is necessary to compare the submitted item with the specified products and acceptable products listed, in the specification and addenda.
It is a Department of Defense (DoD) initiative for the management and control of engineering drawings and related text in a standard repository. JEDMICS has been designed as an open, client-server architecture which provides the user with the ability to locate and obtain approved engineering drawings (and associated data).
The assembly drawing gives the drawing numbers of the subsequent detailed components, quantities required, construction materials and possibly 3D images that can be used to locate individual items. Although mostly consisting of pictographic representations, abbreviations and symbols are used for brevity and additional textual explanations may ...
This should include the part number and name of the component and reference to the drawings that show the component in detail or assembly. Reason(s) for the change. Description of the change. This includes a drawing of the component before and after the change. Generally, these drawings are only of the detail affected by the change.
The standard provides with the document kind classification code (DCC) a structured letter-code for the classification of any kind of document.. A public access database IEC 61355 DB [3] is available in order to facilitate the individuation of the correct code to be applied to a document