Peak demand is typically characterized as annual, daily or seasonal and has the unit of power. [1] Peak demand, peak load or on-peak are terms used in energy demand management describing a period in which electrical power is expected to be provided for a sustained period at a significantly higher than average supply level. Peak demand ...
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...
Load balancing, load matching, or daily peak demand reserve refers to the use of various techniques by electrical power stations to store excess electrical power during low demand periods for release as demand rises. [1] The aim is for the power supply system to have a load factor of 1.
The diversified load is the total expected power, or "load", to be drawn during a peak period by a device or system of devices. The maximum system load is the combination of each device's full load capacity, utilization factor, diversity factor, demand factor, and the load factor. This process is referred to as load diversification.
Base load plants usually have low costs per unit of electricity because they are designed for maximum efficiency and are operated continuously at high output. Geothermal power plants , nuclear power plants , coal-fired plants and bioenergy plants that burn solid material are almost always operated as base load plants, as they can be difficult ...
In a power system, a load curve or load profile is a chart illustrating the variation in demand/electrical load over a specific time. Generation companies use this information to plan how much power they will need to generate at any given time. A load duration curve is similar to a load curve. The information is the same but is presented in a ...
Such arrays will evenly balance the polyphase load between the phases of the source system. For example, balanced two-phase power can be obtained from a three-phase network by using two specially constructed transformers, with taps at 50% and 86.6% of the primary voltage.
Load-loss factor (also loss load factor, LLF, or simply loss factor [1]) is a dimensionless ratio between average and peak values of load loss (loss of electric power between the generator and the consumer in electricity distribution).