Search results
Results From The WOW.Com Content Network
The Blue Line and Red Line are currently the only two MBTA subway rail lines without a direct connection; passengers must either ride one stop on the Green (or Orange) lines to transfer, or walk 0.5 miles (0.80 km) on Cambridge Street between Bowdoin and Charles/MGH.
Plan of the two-platform scheme for the Blue Line level from the 1986 study. The Red–Blue connector is a proposed 0.4-mile (0.6 km) extension of the Blue Line from Bowdoin west under Cambridge Street, providing a direct transfer between the Red and Blue lines. The project was first proposed in 1924, and was returned to consideration in the ...
The proposed Red–Blue connector would extend the Blue Line 0.4 miles (0.64 km) west from Bowdoin to an underground platform at Charles/MGH station, allowing direct transfers to the Red Line. [52]: 1 One of three potential designs for the Blue Line level at Charles/MGH from the 1986 study
The Red Line was the last of the four original Boston subway lines (the others being the Green, Orange, and Blue Lines, opened in 1897, 1901, and 1904, respectively) to be constructed. Construction of the Cambridge tunnel , connecting Harvard Square to Boston, was delayed by a dispute over the number of intermediate stations to be built along ...
The Red–Blue connector is a proposed extension of the Blue Line under Cambridge Street to Charles/MGH station, about 0.4 miles (0.6 km) west of Bowdoin, where a transfer to the Red Line would be available.
Red Line train entering Downtown Crossing station. The subway system has three heavy rail rapid transit lines (the Red, Orange and Blue Lines), and two light rail lines (the Green Line and the Mattapan Line, the latter designated an extension of the Red Line).
AOL Mail welcomes Verizon customers to our safe and delightful email experience!
MBTA Silver Line, a bus rapid transit route to the South Boston waterfront and East Boston, including the airport; 1,000 new commuter parking spaces [37] Fairmount Line improvements; Green Line Extension; However, some projects were removed: Design of the Red-Blue Connector [38] Restoration of Green Line E branch service