When.com Web Search

  1. Ad

    related to: shell method with hole in ground pipe design pdf form

Search results

  1. Results From The WOW.Com Content Network
  2. Shell integration - Wikipedia

    en.wikipedia.org/wiki/Shell_integration

    The shell method goes as follows: Consider a volume in three dimensions obtained by rotating a cross-section in the xy-plane around the y-axis. Suppose the cross-section is defined by the graph of the positive function f(x) on the interval [a, b]. Then the formula for the volume will be:

  3. Shell pavement design method - Wikipedia

    en.wikipedia.org/wiki/Shell_pavement_design_method

    The Shell pavement design method was used in many countries for the design of new pavements made of asphalt. [1] First published in 1963, [2] it was the first mechanistic design method, providing a procedure that was no longer based on codification of historic experience but instead that permitted computation of strain levels at key positions in the pavement.

  4. Caisson (engineering) - Wikipedia

    en.wikipedia.org/wiki/Caisson_(engineering)

    Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.

  5. List of abbreviations in oil and gas exploration and production

    en.wikipedia.org/wiki/List_of_abbreviations_in...

    BGL – below ground level (used as a datum for depths in a well) BGS – British Geological Survey; BGT – borehole geometry tool; BGWP – base of ground-water protection; BH – bloodhound; BHA – bottom hole assembly (toolstring on coiled tubing or drill pipe) BHC – BHC gamma ray log [clarification needed] BHCA – BHC acoustic log ...

  6. Underground storage tank - Wikipedia

    en.wikipedia.org/wiki/Underground_storage_tank

    Many thousands of old underground tanks were replaced with newer tanks made of corrosion resistant materials (such as fiberglass, steel clad with a thick FRP shell, and well-coated steel with galvanic anodes) and others constructed as double walled tanks to form an interstice between two tank walls (a tank within a tank) which allowed for the ...

  7. Earth auger - Wikipedia

    en.wikipedia.org/wiki/Earth_Auger

    A post-hole auger. An earth auger, earth drill, or post-hole auger is a drilling tool used for making holes in the ground. [1] It typically consists of a rotating vertical metal rod or pipe with one or more blades attached at the lower end, that cut or scrape the soil.

  8. Tunnel construction - Wikipedia

    en.wikipedia.org/wiki/Tunnel_construction

    Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.

  9. Directional boring - Wikipedia

    en.wikipedia.org/wiki/Directional_boring

    Directional boring machine. Directional boring, also referred to as horizontal directional drilling (HDD), is a minimal impact trenchless method of installing underground utilities such as pipe, conduit, or cables in a relatively shallow arc or radius along a prescribed underground path using a surface-launched drilling rig.