One common example involves steel beams supporting concrete floor slabs. [1] If the beam is not connected firmly to the slab, then the slab transfers all of its weight to the beam and the slab contributes nothing to the load carrying capability of the beam. However, if the slab is connected positively to the beam with studs, then a portion of ...
Diagram of double tee beam. A double tee or double-T beam is a load-bearing structure that resembles two T-beams connected to each other side by side. The strong bond of the flange (horizontal section) and the two webs (vertical members, also known as stems) creates a structure that is capable of withstanding high loads while having a long span.
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.
Steel failure: the weak part of the connection is represented by the rod. The failure corresponds to the tensile break-out of steel as in case of tensile testing. In this case, concrete base material might be undamaged. Pull-out: the anchor is pulled out from the drilled hole partially damaging the surrounding concrete.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
The total movement of the bridge deck is divided among a number of individual gaps which are created by horizontal surface beams. The individual gaps are sealed by watertight elastomeric profiles, and surface beam movements are regulated by an elastic control system. The drainage of the joint is via the drainage system of the bridge deck.
The steel columns will be connected to the slab by bolting and/or welding them to steel studs extruding from the surface of the poured concrete slab. Pre-cast concrete beams may be delivered on site to be installed for the second floor, after which a concrete slab may be poured for the pavement area. This can be done for multiple stories. [17]
Cellular floor raceways are electrical wiring ducts or cells made from steel floor deck that serve as structural formwork for placement of concrete floor slabs and also as wire and cable raceways within the concrete floor slab.