Search results
Results From The WOW.Com Content Network
The method is an extension of the Newmark's direct integration method originally proposed by Nathan M. Newmark in 1943. It was applied to the sliding block problem in a lecture delivered by him in 1965 in the British Geotechnical Association's 5th Rankine Lecture in London and published later in the Association's scientific journal Geotechnique. [1]
A simple approach involves defining different earthworks features in a computer program and then adjusting elevations manually to calculate the optimal cut and fill. More sophisticated software is able to automatically balance cut and fill while also considering the materials.
As the setback of the wall increases, the size of the sliding wedge is reduced. This reduction lowers the pressure on the retaining wall. [4] The most important consideration in proper design and installation of retaining walls is to recognize and counteract the tendency of the retained material to move downslope due to gravity.
Keyline design – Landscaping to optimize water usage; Land restoration – Process of restoring land to a different state; Grading (earthworks) – In civil engineering, creating a profile; Spoil tip – Pile built of accumulated spoil; Subgrade – Material underneath a road or track; Terrace (earthworks) – Terrain formed by tiered platforms
The wall face is often of precast, segmental blocks, panels or geocells that can tolerate some differential movement. The walls are infilled with granular soil, with or without reinforcement, while retaining the backfill soil. Reinforced walls utilize horizontal layers typically of geogrids. The reinforced soil mass, along with the facing ...
The shear strength and stiffness of soil determines whether or not soil will be stable or how much it will deform. Knowledge of the strength is necessary to determine if a slope will be stable, if a building or bridge might settle too far into the ground, and the limiting pressures on a retaining wall.
Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
Successful design of the slope requires geological information and site characteristics, e.g. properties of soil/rock mass, slope geometry, groundwater conditions, alternation of materials by faulting, joint or discontinuity systems, movements and tension in joints, earthquake activity etc. [4] [5] The presence of water has a detrimental effect ...