Search results
Results From The WOW.Com Content Network
Six main interceptor sewers, totaling almost 100 miles (160 km) in length, were constructed, some incorporating stretches of London's 'lost' rivers. Three of these sewers were north of the river, the southernmost, low-level one being incorporated in the Thames Embankment.
The intercepting sewers, constructed between 1859 and 1865, were fed by 450 miles (720 km) of main sewers that, in turn, conveyed the contents of some 13,000 miles (21,000 km) of smaller local sewers. Construction of the interceptor system required 318 million bricks, 2.7 × 10 6 cubic metres (9.5 × 10 7 cu ft) of excavated earth and 670,000 ...
The ZF S6-650 is a 6-speed manual transmission manufactured by ZF Friedrichshafen AG. It is designed for longitudinal engine applications, and is rated to handle up to 705 newton-metres (520 lbf⋅ft ) of torque .
The first 6-speed manual transmission was introduced in the 1967 Alfa Romeo 33 Stradale. The first 7-speed manual transmission was introduced in the 2012 Porsche 911 (991). [9] In 2008, 75.2% of vehicles produced in Western Europe were equipped with manual transmission, versus 16.1% with automatic and 8.7% with other. [10]
It is derived from the Tremec T-56 6-speed manual transmission. As usual, the forward helical cut gears are synchronized. However, the reverse gear operates through a fully synchronized constant-mesh system. The TR-6060 contains removable wear pads on the shift forks, and uses aluminum alloys for the main case, extension housing, and clutch ...
The ZF S6-53 is a 6-speed manual transmission manufactured by ZF Friedrichshafen AG. It is designed for longitudinal engine applications, and is rated to handle up to 600 newton-metres (443 lbf⋅ft) of torque.
The previously approved downsize will save ratepayers millions, and the city is planning ways to save more on the sewer overhaul project. Akron gets approval for smaller Northside Interceptor ...
As the population of Sheffield increased, Sheffield Corporation bought 23 acres (9.3 ha) of land at Blackburn Meadows, on which to build a sewage treatment works. In August 1884, William Bissett and Son won the contract for its construction, which was overseen by Thomas West, who acted as Clerk of Works. 100 feet (30 m) of standard gauge railway track connected the limeshed to a junction with ...