Search results
Results From The WOW.Com Content Network
The short-circuit current should be around 20 times the rating of the circuit to ensure the branch circuit protection clears a fault quickly. Quick disconnecting is needed, because during a line-to-ground short circuit the grounding pin potential on the power outlet can rise relative to the local earth (concrete floor, water pipe etc.) to a ...
When Q2 turns on, it removes the base current from Q1, thereby reducing the collector current of Q1, which is nearly the load current. Thus, R sens fixes the maximum current to a value given by 0.65/R sens. For example, if R sens = 0.33 Ω, the current is limited to about 2 A even if R load becomes a short (and V o becomes zero).
The current breaking capacity corresponds to a certain voltage, so an electrical apparatus may have more than one breaking capacity current, according to the actual operating voltage. Breaking current may be stated in terms of the total current or just in terms of the alternating-current (symmetrical) component.
Large penetration of the inverter-based resources (IBRs) reduces the short circuit level: a typical synchronous generator can deliver a significant overcurrent, 2-5 [7] p.u., for a relatively long time (minutes), while the component limitations of the IBRs result in overcurrent limits of less than 2 [7] p.u. (usually 1.1-1.2 p.u.).
Many factors determine the level of hazard, including: available fault current, soil type, soil moisture, temperature, underlying rock layers, and clearing time to interrupt a fault. Earth potential rise is a safety issue in the coordination of power and telecommunications services.
A fault current limiter (FCL), also known as fault current controller (FCC), [1] is a device which limits the prospective fault current when a fault occurs (e.g. in a power transmission network) without complete disconnection. The term includes superconducting, solid-state and inductive devices. [2]
Selectivity, also known as circuit breaker discrimination, is the coordination of overcurrent protection devices so that a fault in the installation is cleared by the protection device located immediately upstream of the fault. The purpose of selectivity is to minimize the impact of a failure on the network.
To direct water to many users, municipal water supplies often route it through a water supply network. A major part of this network will consist of interconnected pipes. This network creates a special class of problems in hydraulic design, with solution methods typically referred to as pipe network analysis. Water utilities generally make use ...