When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Work breakdown structure - Wikipedia

    en.wikipedia.org/wiki/Work_breakdown_structure

    The adjacent figure shows a work breakdown structure construction technique that demonstrates the 100% rule and the "progressive elaboration" technique. At WBS Level 1 it shows 100 units of work as the total scope of a project to design and build a custom bicycle. At WBS Level 2, the 100 units are divided into seven elements.

  3. Level of free convection - Wikipedia

    en.wikipedia.org/wiki/Level_of_free_convection

    Diagram showing an air parcel path when raised along B-C-E compared to the surrounding air mass Temperature (T) and humidity (Tw); see CAPE. The level of free convection (LFC) is the altitude in the atmosphere where an air parcel lifted adiabatically until saturation becomes warmer than the environment at the same level, so that positive buoyancy can initiate self-sustained convection.

  4. Business Process Model and Notation - Wikipedia

    en.wikipedia.org/wiki/Business_Process_Model_and...

    The vision of BPMN 2.0.2 is to have one single specification for a new Business Process Model and Notation that defines the notation, metamodel and interchange format but with a modified name that still preserves the "BPMN" brand. The features include: Formalizes the execution semantics for all BPMN elements.

  5. Risk breakdown structure - Wikipedia

    en.wikipedia.org/wiki/Risk_breakdown_structure

    An approach that simply places the risks in a list, a simple table, or even in a database does not provide the strength of using a structured, organized method similar to a Work Breakdown Structure. To fully understand the risks and better identify and assess the risk, a "deep-dive" into each risk, recording as many levels of identification as ...

  6. German weather ship WBS 2 Coburg - Wikipedia

    en.wikipedia.org/wiki/German_weather_ship_WBS_2...

    [1] [3] [2] She was completed in August 1938. [2] Her port of registry was Wesermünde and the Code Letters DFDX were allocated. [1] Coburg was requisitioned by the Kriegsmarine in 1940 and converted to a weather ship. She was commissioned on 3 August as WBS 2 Coburg. She had a complement of eighteen plus eight meteorologists. [3]

  7. Metacentric height - Wikipedia

    en.wikipedia.org/wiki/Metacentric_height

    However, vessels with a higher metacentric height are "excessively stable" with a short roll period resulting in high accelerations at the deck level. Sailing yachts, especially racing yachts, are designed to be stiff, meaning the distance between the centre of mass and the metacentre is very large in order to resist the heeling effect of the ...

  8. Product breakdown structure - Wikipedia

    en.wikipedia.org/wiki/Product_breakdown_structure

    The PBS is identical in format to the work breakdown structure (WBS), but is a separate entity and is used at a different step in the planning process. The PBS precedes the WBS and focuses on cataloguing all the desired outputs (products) needed to achieve the goal of the project.

  9. Hazard analysis and critical control points - Wikipedia

    en.wikipedia.org/wiki/Hazard_analysis_and...

    Hazard analysis and critical control points, or HACCP (/ ˈ h æ s ʌ p / [1]), is a systematic preventive approach to food safety from biological, chemical, and physical hazards in production processes that can cause the finished product to be unsafe and designs measures to reduce these risks to a safe level.

  1. Related searches wbs level 2 adalah singkatan dengan cara yang paling tinggi titik didihnya adalah

    wbs level 2wbs level 1 work
    wbs level 2 breakdownwbs level 1 calculation