  2. Design–build - Wikipedia

    en.wikipedia.org/wiki/Designbuild

    It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or designbuild contractor. It can be subdivided into architect-led designbuild ( ALDB , sometimes known as designer-led designbuild ) and contractor-led designbuild .

  3. Design–bid–build - Wikipedia

    en.wikipedia.org/wiki/Design–bid–build

    Design–bid–build (or design/bid/build, and abbreviated D–B–B or D/B/B accordingly), also known as Design–tender (or "design/tender"), traditional method, or hardbid, is a project delivery method in which the agency or owner contracts with separate entities for the design and construction of a project.

  4. Project delivery method - Wikipedia

    en.wikipedia.org/wiki/Project_delivery_method

    Designbuild–finance–operate-maintain (DBFOM) [10] [11] also referred to as Designbuild–finance–maintain-operate (DBFMO) [12] [13] is a project delivery method very similar to BOOT except that there is no actual ownership transfer. Moreover, the contractor assumes the risk of financing until the end of the contract period.

  5. Pre-construction services - Wikipedia

    en.wikipedia.org/wiki/Pre-construction_services

    The design then starts with a schematic design (SD) stage, followed by a design development stage, and culminates in a construction document state. In the design-bid-build system, there is a construction bidding process that falls between the owner's original solicitation and the summation of a bid by a contractor.

  6. Construction management - Wikipedia

    en.wikipedia.org/wiki/Construction_management

    If speed is important, design and construction contracts can be awarded separately; bidding takes place on preliminary plans in a not-to-exceed contract instead of a single firm design-build contract. The major problem [11] with design-build contracts is an inherent conflict of interest. In a standard contract the architect works for the owner ...

  7. Fast-track construction - Wikipedia

    en.wikipedia.org/wiki/Fast-track_construction

    With the traditional design–bid–build process, a complete set of construction documents and specifications describes what the builder agrees to build and serves as the heart of the contract. On Fast-track projects, the design, construction documents and specifications are incomplete, so setting the final cost presents problems.

  8. Engineering, procurement, and construction - Wikipedia

    en.wikipedia.org/wiki/Engineering,_procurement...

    The EPC contractor coordinates all design, procurement and construction work and ensures that the whole project is completed as required and in time. They may or may not undertake actual site work. EPC companies are often used in large-scale projects, such as power plants, refineries, chemical processing facilities, infrastructure projects, and ...

  9. Integrated project delivery - Wikipedia

    en.wikipedia.org/wiki/Integrated_project_delivery

    Unlike the designbuild project delivery method which typically places the contractor in the leading role on a building project, IPD represents a return to the "master builder" concept where the entire building team including the owner, architect, general contractor, building engineers, fabricators, and subcontractors work collaboratively ...