When.com Web Search

  1. Ad

    related to: trus joist insulated headers concrete floor anchors 2 post

Search results

  1. Results From The WOW.Com Content Network
  2. Post (structural) - Wikipedia

    en.wikipedia.org/wiki/Post_(structural)

    Queen strut: 1)(U.K.) A queen post which does not carry a plate.; [23] 2)(U.S.) A queen post not part of a truss in the engineering sense and in compression (a more modern definition than 2)in Queen Post above). [24] Lateral Queen – a pair of braced posts between a tie beam and collar beam. Prince – A strut associated with a king post truss.

  3. Hold down (structural engineering) - Wikipedia

    en.wikipedia.org/wiki/Hold_down_(structural...

    A hold-down may also refer to clamping device used to anchor a pipe to a structural steel element or concrete floor or allow movement of the pipe in an axial direction. [1] At the bottom, the hold down is connected to the concrete foundation or structural slab by an embedded or epoxied anchor bolt. At the top, the hold down is connected to a ...

  4. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    F/n = 23 kN per anchor during site lifting (n = 2 lifting anchors) Reference to the load capacity tables provided by the anchor manufacturer is required to make an anchor selection for the specific concrete strengths at the time of lifting. Hence the great of the two calculated anchor capacities required at the concrete strength of the initial ...

  5. Wall stud - Wikipedia

    en.wikipedia.org/wiki/Wall_stud

    trimmer or jack − stud to the left or right of a window or door that runs from the bottom plate to the underside of a lintel or header; cripple stud – a stud located either above or below a framed opening, that does not run the full height of the wall; post or column − a doubled or other integral multiple of a group of studs nailed side ...

  6. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...

  7. Trimmer (construction) - Wikipedia

    en.wikipedia.org/wiki/Trimmer_(construction)

    Trimmers are installed parallel to the primary floor or ceiling joists and support headers, which run perpendicular to the primary joists. [1] [2] It can also refer to a jack stud that supports a header above a window or door opening. Traditionally, a stud which was less than full length was sometimes referred to as a cripple. [3] [4] [5]

  8. Timber roof truss - Wikipedia

    en.wikipedia.org/wiki/Timber_roof_truss

    A queen post truss has two principal rafters and two vertical queen posts. [5] The queen post truss extends the span, and combined with spliced joints in the longer members extends the useful span for trusses of these types. As with a king post, the queen posts may be replaced with iron rods and thus called a queen rod truss.

  9. Rim joist - Wikipedia

    en.wikipedia.org/wiki/Rim_joist

    Rim joists are not to be confused with end joists, which are the first and last joists at the ends of a row of joists that make up a floor or deck frame. A rim joist's relationship to the joists is similar to what the top or bottom wall plate is to the studs. It is also confusingly called a header (header also refers to other framing components ...