When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Furring - Wikipedia

    en.wikipedia.org/wiki/Furring

    Vertical, metal furring is applied to the wall to create a channel and receive the siding material. In construction, furring (furring strips) are strips of wood or other material applied to a structure to level or raise the surface, to prevent dampness, to make space for insulation, to level and resurface ceilings or walls, [1] or to increase the beam of a wooden ship.

  3. Lath and plaster - Wikipedia

    en.wikipedia.org/wiki/Lath_and_plaster

    Lime or gypsum plaster is then applied, typically using a wooden board as the application tool. The applier drags the board upward over the wall, forcing the plaster into the gaps between the lath and leaving a layer on the front the depth of the temporary guides, typically about 1 ⁄ 4 inch (6.4 mm). A helper feeds new plaster onto the board ...

  4. First fix and second fix - Wikipedia

    en.wikipedia.org/wiki/First_fix_and_second_fix

    The installation of this equipment takes place in the "third fix" segment of a construction project. It is especially important that installation of sensitive electronic equipment be installed only when a construction site is dust-controlled and prepared for what would be considered "dust free" conditions.

  5. American historic carpentry - Wikipedia

    en.wikipedia.org/wiki/American_historic_carpentry

    Joiners did the finer work of installing trim and paneling. Plank and board are not consistently defined in history. Sometimes these terms are used synonymously. Board means a piece of lumber (timber) 1 ⁄ 2 inch (1.3 cm) to 1.5 inches (3.8 cm) thick and more than 4 inches (10 cm) wide. Plank generally means a piece of lumber (timber ...

  6. Plasterwork - Wikipedia

    en.wikipedia.org/wiki/Plasterwork

    Set up for the next mix. As soon as the table is cleared the laborer is given instructions of how many bags will be needed as well as the next room to be worked in. The table typically consists of folding legs upon which is set a square board of wood and then covered in a plastic sheet upon which the plaster is placed in the center in a large pile.

  7. Fiber cement siding - Wikipedia

    en.wikipedia.org/wiki/Fiber_cement_siding

    Blue fiber cement siding HardiePanel on design-build addition, Ithaca NY. Fiber cement siding (also known as "fibre cement cladding" in the United Kingdom, "fibro" in Australia, and by the proprietary name "Hardie Plank" in the United States) is a building material used to cover the exterior of a building in both commercial and domestic applications.

  8. Stucco - Wikipedia

    en.wikipedia.org/wiki/Stucco

    The two base coats of plaster are either hand-applied or machine sprayed. The finish coat can be troweled smooth, hand-textured, floated to a sand finish or sprayed. Originally, the lath material was strips of wood installed horizontally on the wall, with spaces between, that would support the wet plaster until it cured.

  9. Gypsum block - Wikipedia

    en.wikipedia.org/wiki/Gypsum_block

    A gypsum block is made of gypsum plaster and water. The manufacturing process [1] is automated at production plants where raw gypsum (CaSO 4 ·2H 2 O) is ground and dried, then heated to remove three-quarters of the bound water and thus transformed into calcium sulfate hemihydrate (CaSO 4 ·½H 2 O), also known as gypsum plaster, stucco, calcined gypsum or plaster of Paris.