When.com Web Search

  1. Ads

    related to: critical flow calculation worksheet excel template download

Search results

  1. Results From The WOW.Com Content Network
  2. Standard step method - Wikipedia

    en.wikipedia.org/wiki/Standard_Step_Method

    The solution presented explains how to solve the problem in a spreadsheet, showing the calculations column by column. Within Excel, the goal seek function can be used to set column 15 to 0 by changing the depth estimate in column 2 instead of iterating manually.

  3. Intersection capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Intersection_Capacity...

    In order to calculate the Level of Service for the ICU method, the ICU for an intersection must be computed first. [3] ICU can be computed by: ICU = sum(max (tMin, v/si) * CL + tLi) / CL = Intersection Capacity Utilization CL = Reference Cycle Length tLi = Lost time for critical movement v/si = volume to saturation flow rate, critical movement

  4. Choked flow - Wikipedia

    en.wikipedia.org/wiki/Choked_flow

    Figure 1a shows the flow through the nozzle when it is completely subsonic (i.e. the nozzle is not choked). The flow in the chamber accelerates as it converges toward the throat, where it reaches its maximum (subsonic) speed at the throat. The flow then decelerates through the diverging section and exhausts into the ambient as a subsonic jet.

  5. Failure mode, effects, and criticality analysis - Wikipedia

    en.wikipedia.org/wiki/Failure_Mode,_Effects,_and...

    Failure mode effects and criticality analysis (FMECA) is an extension of failure mode and effects analysis (FMEA).. FMEA is a bottom-up, inductive analytical method which may be performed at either the functional or piece-part level.

  6. Critical path method - Wikipedia

    en.wikipedia.org/wiki/Critical_path_method

    The project has two critical paths: activities B and C, or A, D, and F – giving a minimum project time of 7 months with fast tracking. Activity E is sub-critical, and has a float of 1 month. The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. [1]

  7. Pipe network analysis - Wikipedia

    en.wikipedia.org/wiki/Pipe_network_analysis

    This can be used to calculate mean values (expectations) of the flow rates, head losses or any other variables of interest in the pipe network. This analysis has been extended using a reduced-parameter entropic formulation, which ensures consistency of the analysis regardless of the graphical representation of the network. [3]

  8. Hydraulic jumps in rectangular channels - Wikipedia

    en.wikipedia.org/wiki/Hydraulic_Jumps_in...

    Hydraulic jump in a rectangular channel, also known as classical jump, is a natural phenomenon that occurs whenever flow changes from supercritical to subcritical flow. In this transition, the water surface rises abruptly, surface rollers are formed, intense mixing occurs, air is entrained, and often a large amount of energy is dissipated.

  9. Johnson's parabolic formula - Wikipedia

    en.wikipedia.org/wiki/Johnson's_parabolic_formula

    In structural engineering, Johnson's parabolic formula is an empirically based equation for calculating the critical buckling stress of a column. The formula is based on experimental results by J. B. Johnson from around 1900 as an alternative to Euler's critical load formula under low slenderness ratio (the ratio of radius of gyration to ...