Ad
related to: brzi voz novi sad beograd cena karte na
Search results
Results From The WOW.Com Content Network
The Regio is a service that offers domestic connections to Novi Sad, Subotica, Niš, Zrenjanin, Valjevo, Kraljevo, Užice, Sombor, Požarevac, Zaječar, Vršac, Kikinda, Prokuplje and Ruma. FLIRT3 EMU of Class 413 provide the service on electrified lines, while on non-electrified lines transport is provided by RA2 DMU of Class 711.
Belgrade Centre station was opened on 26 January 2016, [7] serving two daily trains to Novi Sad, as well as BG Voz, Belgrade's commuter railways.. [8] Following gradual re-routing, it gained its current role on 1 July 2018. [ 9 ]
Novi Sad railway station (Serbian: Железничка станица Нови Сад, Železnička stanica Novi Sad) is the main railroad station in Novi Sad, Serbia.The current station, located at Jaše Tomića Boulevard, was opened in 1964, after closing the old railway station from 1883 previously located at what is today the Liman fresh market.
As part of the 2017–2022 construction of the Belgrade–Novi Sad high-speed railway, the station was partially upgraded and reconstructed, including works on the canopy, staircase, plateau, and the addition of a ticket booth and six elevators. The works were to be finished on 28 May 2023, but they extended.
BG Voz began service between New Belgrade and Pančevo Bridge stations on September 1, 2010. Starting from April 15, 2011, the line has been extended westward to Batajnica. Further extension across the Danube, towards Krnjača and Ovča in 2016, was financed from the RZD International credit. The total travel time between the first and the last ...
The Novi Sad Higher Public Prosecutor's Office initiated an investigation. [41] More than 40 people, including construction minister Goran Vesić, were subjected to questioning. [42] At least 11 people were allegedly arrested or brought in to the prosecutor’s office by the police, including Vesić, who said that he had voluntarily surrendered ...
The Belgrade–Bar railway (Serbian: Пруга Београд–Бар, Pruga Beograd–Bar) is a 476.59 km (296.14 mi) long electrified main line connecting the Serbian capital of Belgrade with the town of Bar, a major seaport in Montenegro. Completed in 1976, which connects Belgrade with the Mediterranean port of Bar.
In 2010, it was stated that the construction of the metro would begin in two years. The first line would be an east–west line, going above ground in Novi Beograd and underground in the centre and neighbouring districts. The second line was planned from north to south, going underground in the centre through the already-constructed tunnels.