  2. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    The underside of a waffle slab, showing the grid like structure. A waffle slab or two-way joist slab is a concrete slab made of reinforced concrete with concrete ribs running in two directions on its underside. [1] The name waffle comes from the grid pattern created by the reinforcing ribs.

  4. Marcus' method - Wikipedia

    en.wikipedia.org/wiki/Marcus'_method

    Marcus's method is a structural analysis used in the design of reinforced concrete slabs.The method was developed by Henri Marcus and described in 1938 in Die Theorie elastischer Gewebe und ihre Anwendung auf die Berechnung biegsamer Platten. [1]

  5. Waffle slab foundation - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab_foundation

    Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.

  6. Structural drawing - Wikipedia

    en.wikipedia.org/wiki/Structural_drawing

    A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built.Structural drawings are generally prepared by registered professional engineers, and based on information provided by architectural drawings.

  7. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    On-site concrete slabs are built on the building site using formwork - a type of boxing into which the wet concrete is poured. If the slab is to be reinforced, the rebars, or metal bars, are positioned within the formwork before the concrete is poured in. [26] Plastic-tipped metal or plastic bar chairs, are used to hold the rebar away from the ...

  8. Shallow foundation - Wikipedia

    en.wikipedia.org/wiki/Shallow_foundation

    Slab-on-grade or floating slab foundations are a structural engineering practice whereby the concrete slab that is to serve as the foundation for the structure is formed from a mold set into the ground. The concrete is then placed into the mold, leaving no space between the ground and the structure.

  9. Reinforced concrete - Wikipedia

    en.wikipedia.org/wiki/Reinforced_concrete

    It is made of reinforced concrete clad in a mosaic of thousands of triangular soapstone tiles. [4] Many different types of structures and components of structures can be built using reinforced concrete elements including slabs, walls, beams, columns, foundations, frames and more. Reinforced concrete can be classified as precast or cast-in-place ...