When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  3. Load - Wikipedia

    en.wikipedia.org/wiki/Load

    Load cell, a transducer that is used to create an electrical signal; Load factor (computer science), the ratio of the number of records to the number of addresses within a data structure; Load factor (electrical), the average power divided by the peak power over a period of time; Load file, the file used to import data into a database or to ...

  4. Load factor - Wikipedia

    en.wikipedia.org/wiki/Load_factor

    Load factor (electrical), the average power divided by the peak power over a period of time; Capacity factor, the ratio of actual energy output to the theoretical maximum possible in a power station; Passenger load factor, the ratio of revenue passenger miles to available seat miles of a particular transportation operation (e.g. a flight)

  5. Utilization factor - Wikipedia

    en.wikipedia.org/wiki/Utilization_factor

    Utilization factor (solid line) with blade-to-gas speed ratio. The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used.

  6. Load-loss factor - Wikipedia

    en.wikipedia.org/wiki/Load-loss_factor

    Multiple empirical formulae exist that relate the loss factor to the load factor (Dickert et al. in 2009 listed nine [5]). Similarly, the ratio between the average and the peak current is called form coefficient k [ 6 ] or peak responsibility factor k , [ 7 ] its typical value is between 0.2 to 0.8 for distribution networks and 0.8 to 0.95 for ...

  7. Load profile - Wikipedia

    en.wikipedia.org/wiki/Load_Profile

    In a power system, a load curve or load profile is a chart illustrating the variation in demand/electrical load over a specific time. Generation companies use this information to plan how much power they will need to generate at any given time. A load duration curve is similar to a load curve. The information is the same but is presented in a ...

  8. Structural load - Wikipedia

    en.wikipedia.org/wiki/Structural_load

    A structural load or structural action is a mechanical load (more generally a force) applied to structural elements. [ 1 ] [ 2 ] A load causes stress , deformation , displacement or acceleration in a structure .

  9. Load duration curve - Wikipedia

    en.wikipedia.org/wiki/Load_duration_curve

    A LDC is similar to a load curve but the demand data is ordered in descending order of magnitude, rather than chronologically. The LDC curve shows the capacity utilization requirements for each increment of load. The height of each slice is a measure of capacity, and the width of each slice is a measure of the utilization rate or capacity ...