The generic term used by the International Union of Railways for the technology is overhead line. [1] It is known variously as overhead catenary, overhead contact line (OCL), overhead contact system (OCS), overhead equipment (OHE), overhead line equipment (OLE or OHLE), overhead lines (OHL), overhead wiring (OHW), traction wire, and trolley wire.
Overhead lines or overhead wires are used to transmit electrical energy to trams, trolleybuses or trains. Overhead line is designed on the principle of one or more overhead wires situated over rail tracks. Feeder stations at regular intervals along the overhead line supply power from the high-voltage grid.
A related but separate gauge is the loading gauge: a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. The difference between these two gauges is called the clearance .
In this system, the current is mainly carried between the overhead line and a feeder transmission line instead of the rail. The overhead line (3) and feeder (5) are on opposite phases so the voltage between them is 50 kV, while the voltage between the overhead line (3) and the running rails (4) remains at 25 kV. Periodic autotransformers (9 ...
However, in the first years building overhead line when crossing a railway line or a road, a scaffold under the line was required. Later in Germany and some other countries on each end of a powerline crossing of a state-operated railway, a dead-end tower was required, which can still be seen on some old power lines.
Used both third rail DC (1200 V) and overhead line AC (6.3 kV 25 Hz) until 1955. Also uses German standard 15 kV AC 16 2/3 Hz overhead electrification on the section between Neugraben and Stade on line S3, opened in December 2007.
The overhead wiring, generally having two separate overhead lines and the rail for the third phase, was more complicated, and the low frequency used required a separate generation or conversion and distribution system. Train speed was restricted to one to four speeds, with two or four speeds obtained by pole-changing or cascade operation or both.
The goal was to reduce travel time in this corridor from 4.5 hours to less than 3 hours. Revenue from this service was expected to play a critical role in helping Amtrak achieve operating self-sufficiency by 2003. Before Amtrak could begin high-speed rail service, 155 miles (249 km) of rail line between New Haven and Boston had to be electrified.