Ads
related to: sacramento to los angeles stops time in detroit
Search results
Results From The WOW.Com Content Network
Light rail service began on March 12, 1987, with the opening of 13 stations between Watt/I-80 and 8th & O. [1] The second phase of the initial line opened on September 5, 1987, with 13 stations between Archives Plaza and Butterfield. [2] In 1994, a pair of infill stations opened at 39th Street and 48th Street. [8]
The segment from Burbank to Los Angeles (LA Union Station) is 14 miles (23 km). [39] Non-stop design speed for this segment is about 7 minutes. The one-way fare between Burbank and Los Angeles is expected to cost $26 in 2013 dollars. [15] [40] The Burbank to Los Angeles route was approved in January 2022. [41]
The project is split into two major phases: Phase 1 is to connect from San Francisco via the Central Valley to Los Angeles; Phase 2 is an extension of that system both to the north from Merced to Sacramento and to the south from Los Angeles via the Inland Empire to San Diego. As of 2024, the High-Speed Rail Authority is targeting completion of ...
For premium support please call: 800-290-4726 more ways to reach us
For premium support please call: 800-290-4726 more ways to reach us
In September 2003, Sacramento Regional Transit opened the first phase of the South Line (now called the Blue Line), which was a 6.3-mile (10.1 km) extension to South Sacramento. In June 2004, the Gold Line extended from the Mather Field/Mills station to Sunrise Boulevard , and on October 15, 2005, a 7.4-mile (11.9 km) extension from the Sunrise ...