When.com Web Search

  1. Ads

    related to: shinkansen tokyo to hokkaido timetable english

Search results

  1. Results From The WOW.Com Content Network
  2. Hayabusa (train) - Wikipedia

    en.wikipedia.org/wiki/Hayabusa_(train)

    The Hayabusa (はやぶさ, "Peregrine falcon") is a high-speed Shinkansen service operated by East Japan Railway Company (JR East) and Hokkaido Railway Company (JR Hokkaido) between Tokyo and Shin-Hakodate-Hokuto in Japan since 26 March 2016. [1]

  3. Tōhoku Shinkansen - Wikipedia

    en.wikipedia.org/wiki/Tōhoku_Shinkansen

    Four services currently operate on the Tōhoku Shinkansen, the all-stop Nasuno, and the limited-stop Yamabiko, Hayate, and Hayabusa, with the latter two providing through service onto the Hokkaido Shinkansen. As of 2021, the fastest travel times between Tokyo and Shin-Aomori are on the Hayabusa service, at 2 hours and 58 minutes. [2]

  4. Hokkaido Shinkansen - Wikipedia

    en.wikipedia.org/wiki/Hokkaido_Shinkansen

    The dual-gauge Kaikyo Line near Kikonai Station in March 2016. In preparation for the opening of the Hokkaido Shinkansen, the Seikan Tunnel (Kaikyō Line) and associated approaches (approximately 82 km or 51 mi in total) [6] were converted to dual gauge, with both the Shinkansen 1,435 mm (4 ft 8 + 1 ⁄ 2 in) standard and 1,067 mm (3 ft 6 in) narrow gauge tracks.

  5. Hayate (train) - Wikipedia

    en.wikipedia.org/wiki/Hayate_(train)

    Hayate (はやて) is a high-speed Shinkansen service operated in Japan, on the Tōhoku Shinkansen by East Japan Railway Company (JR East) since 2002 and on the Hokkaido Shinkansen by JR Hokkaido since 26 March 2016. It operates as far as the northern terminus of Shin-Hakodate-Hokuto, and it is the second-fastest service on the Tohoku ...

  6. Shin-Aomori Station - Wikipedia

    en.wikipedia.org/wiki/Shin-Aomori_Station

    Shin-Aomori Station is the northern terminus of the Ōu Main Line from Fukushima via Akita (a distance of 486.3 km (302.2 mi)), although most trains continue to Aomori.It also forms the northern terminus of the high-speed Tōhoku Shinkansen line from Tokyo (a distance of 674.0 km (418.8 mi)), operated by JR East, and the starting point of the Hokkaido Shinkansen to Shin-Hakodate-Hokuto (a ...

  7. E5 and H5 Series Shinkansen - Wikipedia

    en.wikipedia.org/wiki/E5_and_H5_Series_Shinkansen

    The E5 series is operated by East Japan Railway Company (JR East); it was introduced on Tohoku Shinkansen services on 5 March 2011 [6] and on Hokkaido Shinkansen services on 26 March 2016. A total of 59 10-car sets are on order, with three sets in service in time for the start of new Hayabusa services to Shin-Aomori in March 2011.