A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built.Structural drawings are generally prepared by registered professional engineers, and based on information provided by architectural drawings.
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.
The STAAD.Pro Advanced Slab Design workflow is an integrated tool that works from within the STAAD.Pro environment. Concrete slabs can be defined, and the data can be transferred to RAM Concept. The data passed into RAM Concept includes the geometry, section and material properties, loads and combination information, and analysis results.
The shop drawing normally shows more detail than the construction documents. It is drawn to explain the fabrication and/or installation of the items to the manufacturer’s production crew or contractor's installation crews. The style of the shop drawing is usually very different from that of the architect’s drawing.
This detail compares the original design (left) and the submitted alternate detail for the skywalks at the Hyatt Regency, Kansas City. The proposed alternate compounded the loads on the bolts, which resulted in the skywalks collapsing on July 17, 1981. 114 people were killed. This example illustrates the importance of submittal review.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
edge distance Drilled holes, and fasteners are commonly required to have a minimum edge distance (min ED). EO, ECO, ECN: engineering order: An order from the engineering department (to be followed by the production department or vendor) overriding/superseding a detail on the drawing, which gets superseded with revised information.