When.com Web Search

  1. Ads

    related to: rainproof concrete after pouring floor plan design tool
    • Pricing

      Find out how inexpensive it can be

      to run your business on Houzz Pro

    • Estimates & Proposals

      Create perfect estimates in minutes

      & let your clients approve online.

Search results

  1. Results From The WOW.Com Content Network
  2. Hydrophobic concrete - Wikipedia

    en.wikipedia.org/wiki/Hydrophobic_concrete

    The coating is applied between 1.25-1.5 lb per square yard and continues until the whole surface is covered. If the surface requires another coat, it must be applied within forty eight hours of the initial application of the hydrophobic mixture. Once applied, the concrete must cure in a moist environment two to three hours after the application.

  3. Voided biaxial slab - Wikipedia

    en.wikipedia.org/wiki/Voided_biaxial_slab

    The overall mass of concrete can be reduced by 35–50% depending on the design, [1] as a consequence of reduced slab mass, as well as lower requirements for vertical structure and foundations. Biaxial slabs commonly span up to 20 metres at a thickness of around 500 mm. [ citation needed ] The added strength also reduces the acoustic ...

  4. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  5. 3D concrete printing - Wikipedia

    en.wikipedia.org/wiki/3D_concrete_printing

    The fleet of Vulcan printers can produce eight different floor plans of 3 to 4 bedrooms and 2 to 3 baths. [22] A concrete feeding system known as Magma supplies the Vulcan printer with Icon's developed concrete mix known as Lavacrete, which can adjust for site weather conditions and supply read-to-print concrete automatically. [22]

  6. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]

  7. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    After the concrete has set the wood may be removed. Formwork can also be permanent, and remain in situ post concrete pour. For large slabs or paths that are poured in sections, this permanent formwork can then also act as isolation joints within concrete slabs to reduce the potential for cracking due to concrete expansion or movement.

  1. Ad

    related to: rainproof concrete after pouring floor plan design tool