When.com Web Search

  1. Ad

    related to: ideal transformer under no load bank for rv storage

Search results

  1. Results From The WOW.Com Content Network
  2. Voltage regulation - Wikipedia

    en.wikipedia.org/wiki/Voltage_regulation

    Under no load, when no current flows through the secondary coils, V nl is given by the ideal model, where V S = V P *N S /N P. Looking at the equivalent circuit and neglecting the shunt components, as is a reasonable approximation, one can refer all resistance and reactance to the secondary side and clearly see that the secondary voltage at no ...

  3. Open-circuit test - Wikipedia

    en.wikipedia.org/wiki/Open-circuit_test

    The open-circuit test, or no-load test, is one of the methods used in electrical engineering to determine the no-load impedance in the excitation branch of a transformer. The no load is represented by the open circuit, which is represented on the right side of the figure as the "hole" or incomplete part of the circuit.

  4. Load bank - Wikipedia

    en.wikipedia.org/wiki/Load_bank

    A load bank is a piece of electrical test equipment used to simulate an electrical load, to test an electric power source without connecting it to its normal operating load. [ 1 ] [ 2 ] During testing, adjustment, calibration, or verification procedures, a load bank is connected to the output of a power source, such as an electric generator ...

  5. Utilization categories - Wikipedia

    en.wikipedia.org/wiki/Utilization_categories

    Usually utilization category is mentioned in most of the switch gear, with the above contactor stating to be used under AC1 - resistive load & AC3 for motor usage. In electrical engineering utilization categories are defined by IEC standards [1] and indicate the type of electrical load and duty cycle of the loads to ease selection of contactors ...

  6. Transformer types - Wikipedia

    en.wikipedia.org/wiki/Transformer_types

    The equivalent power rating of the autotransformer is lower than the actual load power rating. It is calculated by: load VA × (|Vin – Vout|)/Vin. [2] For example, an auto transformer that adapts a 1000 VA load rated at 120 volts to a 240 volt supply has an equivalent rating of at least: 1,000 VA (240 V – 120 V) / 240 V = 500 VA.

  7. Isolation transformer - Wikipedia

    en.wikipedia.org/wiki/Isolation_transformer

    In electronics testing and servicing, an isolation transformer is a 1:1 (under load) power transformer used for safety. Without it, exposed live metal in a device under test is at a hazardous voltage relative to grounded objects such as a heating radiator or oscilloscope ground lead (a particular hazard with some old vacuum-tube equipment with ...

  8. Zigzag transformer - Wikipedia

    en.wikipedia.org/wiki/Zigzag_transformer

    A conventional six-winding, grounding transformer or zigzag bank, [1] with the same winding and core quantity as a conventional three-phase transformer, can also be used in zigzag winding connection. In all cases the first coil on each zigzag winding core is connected contrariwise to the second coil on the next core.

  9. Static VAR compensator - Wikipedia

    en.wikipedia.org/wiki/Static_VAR_compensator

    If the power system's reactive load is capacitive (leading), the SVC will use thyristor controlled reactors to consume VARs from the system, lowering the system voltage. Under inductive (lagging) conditions, the capacitor banks are automatically switched in, thus providing a higher system voltage. By connecting the thyristor-controlled reactor ...