Ads
related to: does bleach damage septic systems in homes work with electricity cost estimate
Search results
Results From The WOW.Com Content Network
The aeration stage and the disinfecting stage are the primary differences from a traditional septic system; in fact, an aerobic treatment system can be used as a secondary treatment for septic tank effluent. [1] These stages increase the initial cost of the aerobic system, and also the maintenance requirements over the passive septic system.
Onsite sewage facilities (OSSF), also called septic systems, are wastewater systems designed to treat and dispose of effluent on the same property that produces the wastewater, in areas not served by public sewage infrastructure. A septic tank and drainfield combination is a fairly common type of on-site sewage facility in the Western world.
Certain chemicals may damage the components of a septic tank or kill the bacteria needed in the septic tank for the system to operate properly, such as pesticides, herbicides, materials with high concentrations of bleach or caustic soda (lye), [citation needed] or any other inorganic materials such as paints or solvents. [12]
If there is a suitable septic tank in place, pumping the effluent from the tank is the lowest cost option for initial costs. Whether the septic tank is the lowest cost option over time depends on the cost of electricity in the area, how often the tank must be emptied and how much it costs to have the solids pumped out of the tank.
Most of the solids are removed by the septic tanks, so the treatment plant can be much smaller than a typical plant. In addition, because of the vast reduction in solid waste, a pumping system, rather than a gravity system, can be used to move the wastewater. The pipes have small diameters, typically 1.5 to 4 inches (4 to 10 cm).
The levelized cost of electricity (LCOE) is a metric that attempts to compare the costs of different methods of electricity generation consistently. Though LCOE is often presented as the minimum constant price at which electricity must be sold to break even over the lifetime of the project, such a cost analysis requires assumptions about the value of various non-financial costs (environmental ...