When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Ursa Major (excavator) - Wikipedia

    en.wikipedia.org/wiki/Ursa_Major_(excavator)

    The Ursa Major was one of five large walking draglines operated at Black Thunder, with the next two largest in the dragline fleet being Thor, a B-E 1570W - which has a 97.5-metre (320 ft) boom and a 69-cubic-metre (2,400 cu ft) bucket - and Walking Stick, a B-E 1300W with a 92-metre (302 ft) boom and a 34-cubic-metre (1,200 cu ft) bucket.

  3. Dragline excavator - Wikipedia

    en.wikipedia.org/wiki/Dragline_excavator

    A dragline bucket system consists of a large bucket which is suspended from a large truss-like boom (or mast) with wire ropes. The bucket is maneuvered by means of a number of ropes and chains. The hoist rope, powered by large diesel or electric motors, supports the bucket and hoist-coupler assembly from the boom. The dragrope is used to draw ...

  4. Trenchless technology - Wikipedia

    en.wikipedia.org/wiki/Trenchless_technology

    The method requires considering soil characteristics and the loads applied to the surface. In cases where the soil is sandy, the water table is at shallow depth, or heavy loads like that of urban traffic are expected, the depth of excavation has to be such that the pressure of the load on the surface does not affect the bore, otherwise there is ...

  5. Trencher (machine) - Wikipedia

    en.wikipedia.org/wiki/Trencher_(machine)

    This type of trencher can cut ground that is too hard to cut with a bucket-type excavator, and can also cut narrow and deep trenches. The angle of the boom can be adjusted to control the depth of the cut. To cut a trench, the boom is held at a fixed angle while the machine creeps slowly.

  6. Underground power line - Wikipedia

    en.wikipedia.org/wiki/Underground_power_line

    For example, as of 2024, the Public Service Commission of Wisconsin determined that the installation cost of a 69-kilovolt aboveground power line is $284,000 per mile. In contrast, an equivalent underground line costs $1.5 million per mile. As ratepayers ultimately bear these costs, utilities exercise discretion in selecting which lines to bury ...

  7. Live-line working - Wikipedia

    en.wikipedia.org/wiki/Live-line_working

    The first techniques for live-line working were developed in the early years of the 20th century, and both equipment and work methods were later refined to deal with increasingly higher voltages. In the 1960s, methods were developed in the laboratory to enable field workers to come into direct contact with high voltage lines. Such methods can ...

  8. AOL Mail

    mail.aol.com/d?reason=invalid_cred

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  9. Power shovel - Wikipedia

    en.wikipedia.org/wiki/Power_shovel

    Principle of rope-shovel operation. [1]A power shovel, also known as a motor shovel, stripping shovel, front shovel, mining shovel or rope shovel, [2] is a bucket-equipped machine usually powered by steam, diesel fuel, gasoline or electricity and used for digging and loading earth or fragmented rock and for mineral extraction. [3]