All stations on the Ellenbrook line branch are fully accessible [8]: 2–3 and have 150-metre-long (490 ft) island platforms, long enough for a six-car train. Most stations between Perth and Bayswater only have platforms long enough for four-car trains, limiting the length of trains that can run on the Ellenbrook line.
The station is the north-eastern terminus of the Ellenbrook line. Ellenbrook station consists of a ground-level island platform with a bus interchange and car park. The contract for the construction of the Ellenbrook line was awarded to Laing O'Rourke in October 2020. Construction on Ellenbrook station started in January 2022 and was completed ...
Whiteman Park railway station is a suburban railway station on the Ellenbrook line in Perth, Western Australia.The station is located on the western side of Drumpellier Drive in Whiteman, and will serve the surrounding suburbs of Brabham, Dayton, Henley Brook and West Swan, as well as the nature reserve and tourism destination of Whiteman Park.
The plan prioritised completion of the Airport line, the Joondalup line extension to Yanchep, the Armadale line extension to Byford, and the Thornlie line extension. [8] That was expanded to reincorporate a rail line to Ellenbrook and Karnup station by December 2016. [9]
Noranda is served by Transperth Trains operating along the Ellenbrook line to Perth and Ellenbrook railway stations. It is projected that a journey to Perth will take 18 minutes. Noranda station is in fare zone 2. [8] Noranda station is projected to have 1,810 passenger boardings per day in 2031. [9]
The Ellenbrook line runs from Perth to Ellenbrook and has 13 stations, including the two termini. The maximum speed of the Midland line is 100 kilometres per hour (62 mph) and the maximum speed of the Fremantle line is 90 kilometres per hour (56 mph). The maximum speed of the Ellenbrook line is 130 kilometres per hour (81 mph). [69]
Morley station reached completion in November 2024, and on 8 December 2024, the Ellenbrook line opened. During peak, trains stop at Morley station every twelve minutes in each direction, increasing to every fifteen minutes off-peak and on weekends and public holidays. At night, trains are half-hourly or hourly.
During planning and construction, Ballajura station was known as Malaga station [12] [13] and the Ellenbrook line was known as the Morley–Ellenbrook line. [14] Constructing the Ellenbrook line by 2023 as part of the Metronet project was committed to by the Labor Party before it won the 2017 state election. [15] [16] [17] The route of the ...