When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Roof pitch - Wikipedia

    en.wikipedia.org/wiki/Roof_pitch

    In the imperial measurement systems, "pitch" is usually expressed with the rise first and run second (in the US, run is held to number 12; [1] e.g., 3:12, 4:12, 5:12). In metric systems either the angle in degrees or rise per unit of run, expressed as a '1 in _' slope (where a '1 in 1' equals 45°) is used.

  3. Grade (slope) - Wikipedia

    en.wikipedia.org/wiki/Grade_(slope)

    Slope may still be expressed when the horizontal run is not known: the rise can be divided by the hypotenuse (the slope length). This is not the usual way to specify slope; this nonstandard expression follows the sine function rather than the tangent function, so it calls a 45 degree slope a 71 percent grade instead of a 100 percent. But in ...

  4. Slope - Wikipedia

    en.wikipedia.org/wiki/Slope

    Slope illustrated for y = (3/2)x − 1.Click on to enlarge Slope of a line in coordinates system, from f(x) = −12x + 2 to f(x) = 12x + 2. The slope of a line in the plane containing the x and y axes is generally represented by the letter m, [5] and is defined as the change in the y coordinate divided by the corresponding change in the x coordinate, between two distinct points on the line.

  5. Deflection (engineering) - Wikipedia

    en.wikipedia.org/wiki/Deflection_(engineering)

    Deflection (f) in engineering. In structural engineering, deflection is the degree to which a part of a long structural element (such as beam) is deformed laterally (in the direction transverse to its longitudinal axis) under a load. It may be quantified in terms of an angle (angular displacement) or a distance (linear displacement).

  6. Tape correction (surveying) - Wikipedia

    en.wikipedia.org/wiki/Tape_correction_(surveying)

    For common tape measurements, the tape used is a steel tape with coefficient of thermal expansion C equal to 0.000,011,6 units per unit length per degree Celsius change. This means that the tape changes length by 1.16 mm per 10 m tape per 10 °C change from the standard temperature of the tape.

  7. Steep grade railway - Wikipedia

    en.wikipedia.org/wiki/Steep_grade_railway

    The cars are permanently attached to the cable, which stops, starts and reverses as required. Cars are often custom built for the slope, with specially raked seating and steps rather than a sloped floor. Taken to its logical conclusion as the slope becomes vertical, a funicular becomes an elevator.

  8. Angle of repose - Wikipedia

    en.wikipedia.org/wiki/Angle_of_repose

    Angle of repose of a heap of sand Sandpile from the Matemateca collection. The angle of repose, or critical angle of repose, [1] of a granular material is the steepest angle of descent or dip relative to the horizontal plane on which the material can be piled without slumping.

  9. Drainage gradient - Wikipedia

    en.wikipedia.org/wiki/Drainage_gradient

    Typically on straight road sections, the drainage gradient is at least 1–3% due to the normal cross slope of 1–3%. In curved sections the drainage gradient is higher, and may often reach 5–12% due to superelevated CS that may reach 5–8% in areas with icy roads and up to 12% in areas without icy roads.