Search results
Results From The WOW.Com Content Network
Soil compaction is a vital part of the construction process. It is used for support of structural entities such as building foundations, roadways, walkways, and earth retaining structures to name a few. For a given soil type certain properties may deem it more or less desirable to perform adequately for a particular circumstance.
In military engineering, earthworks are, more specifically, types of fortifications constructed from soil. Although soil is not very strong, it is cheap enough that huge quantities can be used, generating formidable structures. Examples of older earthwork fortifications include moats, sod walls, motte-and-bailey castles, and hill forts.
Bulk density of soil is usually determined from a core sample which is taken by driving a metal corer into the soil at the desired depth and horizon. [6] This gives a soil sample of known total volume, V t. From this sample the wet bulk density and the dry bulk density can be determined. [7]
Road cutting. In civil engineering, a cut or cutting is where soil or rock from a relative rise is removed. Cuts are typically used in road, rail, and canal construction to reduce a route's length and grade. Cut and fill construction uses the spoils from cuts to fill in defiles to create straight routes at steady grades cost-effectively.
The first modern theoretical models for soil consolidation were proposed in the 1920s by Terzaghi and Fillunger, according to two substantially different approaches. [1] The former was based on diffusion equations in eulerian notation, whereas the latter considered the local Newton’s law for both liquid and solid phases, in which main variables, such as partial pressure, porosity, local ...
This phenomenon of soil behaviour can be included in the Hardening Soil model by means of a dilatancy cut-off. In order to specify this behaviour, the initial void ratio, e i n i t {\displaystyle e_{init}} , and the maximum void ratio, e m a x {\displaystyle e_{max}} , of the material must be entered as general parameters.
The bearing capacity of soil is the maximum average contact pressure between the foundation and the soil which should not produce shear failure in the soil. Ultimate bearing capacity is the theoretical maximum pressure which can be supported without failure; allowable bearing capacity is the ultimate bearing capacity divided by a factor of safety.
The drilling waste is spread on the land and incorporated into the upper soil zone (typically upper 6–8 inches of soil) to enhance hydrocarbon volatization and biodegradation. The land is managed so that the soil system can degrade, transport, and assimilate the waste constituents. Each land treatment site is generally used only once.