Ads
related to: deck beam vs joist board fence system cost
Search results
Results From The WOW.Com Content Network
In flooring construction, the rim joists sit on the sill plates; in deck construction, they are parallel to the support beams and sit on the beams or in some cases, cantilever away from the beams. A double thickness board in the position of a rim joist is called a flush beam and serves a dual purpose, providing primary support for the joist ...
Composite deck boards are sold in either grooved or solid sided versions. The grooved composite board is fastened with hidden deck fasteners or clips, while the solid board is typically face-screwed. Most composite deck board manufacturers produce lengths of 12, 16, or 20 feet (3.7, 4.9, or 6.1 m), 5 + 1 ⁄ 2 by 3 ⁄ 4 inch (140 mm × 19 mm).
The wood is categorized as a board if its width is less than 2 + 1 ⁄ 2 in (64 mm), and its thickness is less than 1 + 1 ⁄ 2 in (38 mm). A plank used in a building as a horizontal supporting member that runs between foundations, walls, or beams to support a ceiling or floor is called a joist.
A flitch beam is a simple form of composite construction sometimes used in North American light frame construction. [3] This occurs when a steel plate is sandwiched between two wood joists and bolted together. A flitch beam can typically support heavier loads over a longer span than an all-wood beam of the same cross section.
Also in North America, hardwood lumber is commonly sold in a "quarter" system, when referring to thickness; 4/4 (four quarter) refers to a 1-inch-thick (25 mm) board, 8/4 (eight quarter) is a 2-inch-thick (51 mm) board, etc. This "quarter" system is rarely used for softwood lumber; although softwood decking is sometimes sold as 5/4, even though ...
The jetty beams or joists conform t floor dimensions above, but are at right angles to the jetty-plates that conform to the shorter dimensions of "roof" of the floor below. Jetty beams are mortised at 45° into the sides of the dragon beams. They are the main constituents of the cantilever system, and determine how far the jetty projects.